Our Case Studies
In the 30+ years that UKG has been providing external refurbishment and structural repairs, as well as our newer service offerings which include Fire Risk Assessment, we have worked on a wide range of diverse projects for Government, Social Housing, Commercial and Heritage clients. These are just some of our case studies to give you a flavour of the full extent of our service capabilities.
Concrete Repair Specialist for £1.87 Bn Battersea Power Station Redevelopment
UKG are the concrete repair specialist for the redevelopment of Battersea Power Station, the iconic 1930’s Grade II Listed London landmark.
Concrete Repairs for Grade II Listed Former Vinyl Factory
UKG were contracted to take care of all concrete repairs to Enterprise House a historic Grade II Listed former gramophone factory.
Battersea Power Station Switch House West
Switch House West was the first section of Battersea Power Station to be designed and built in the early 1930s. It was also the first area to which UKG was assigned when we were awarded the concrete repair works for the redevelopment of this iconic London landmark in 2018.
Conservation Status Berthold Lubetkin Residential Blocks
Project to renovate and regenerate the unusually designed concrete components to the resident blocks throughout this estate.
Enabling Works & Soft Strip Demolition for Whiteleys of Bayswater Grade II Listed Façade
UKG were retained in November 2021 to complete a range of enabling works and soft strip demolition to the Grade II Listed façade of Whiteleys of Bayswater.
External Refurbishment for the Nobu Hotel, Portman Square
UKG were retained to complete a range of external refurbishment tasks on the Nobu Hotel Portman Square.
Port of Dover Sea Wall Concrete Repairs
Essential structural repair and refurbishment works to a section of the sea wall adjacent to Dover Port.
Concrete Refurbishment for 1970’s Roupell Estate
UKG worked on a 9-month concrete refurbishment project with Mears and Lambeth Council to renovate & regenerate the concrete components to the resident blocks within this estate.
Structural Refurbishment of Occupied High-Rise Tower Blocks
UKG were retained in December 2015 to carry out the structural refurbishment of these two high rise tower blocks, which were both occupied.
Five Year Fabric Repairs Contract for Havering Borough Council
UKG were contracted to undertake all fabric repairs, including concrete, brickwork and render, to properties and apartment blocks across a variety of housing estates.